Specifications include, but are not limited to: • Preliminary Engineering/Alternatives Analysis (PE/AA) This is a concept stage in which a variety of engineering solutions shall be developed by the Consultant and analyzed for cost/benefit and tradeoff analyses. A precise engineering solution can only be determined through this stage due to many design considerations such as: o Potentially sensitive habitat; o Constructability issues (including potential traffic control on I-210 for access); o Agency coordination; o Aesthetics; and o Budget consideration. • Public Outreach Upon completion of the PE/AA, a public engagement effort will be undertaken to inform stakeholders and the general public of the various alternatives and solicit their input for defining and refining the Scope of Work of the preferred alternative. • Preparation of an Environmental document including pertinent special studies and mitigation plan • Agency permitting with U. S. Army Corps of Engineers, Regional Water Quality Control Board, California Fish and Wildlife, Caltrans, County of Los Angeles Department of Parks and Recreation, and Los Angeles County Flood Control District • Project coordination, including meetings and workshops with City staff, La Cañada Flintridge Trails Council, Public Works and Traffic Commission, and City Council • Development of plans, specifications and cost estimates (PS&E). The Consultant shall indicate in its proposal to which percentage the PS&E can be developed or achieved with the Grant funds.