Specifications include, but are not limited to: The Electrical Power Monitoring Services provides for performing power quality monitoring and verification of electrical maximum demand on a select group of existing electrical equipment and systems at John Wayne Airport. The work includes the installation of temporary power monitoring units with all required current transformers (CTs), and other accessories to perform continuous power monitoring for a duration of 30 days. The work also includes checking and verifying the programming and settings of the airport’s existing permanent Schneider power monitoring system and extracting data and reports. Refer to the Contractor Scope of Work for further information and temporary monitoring locations.