Specifications include, but are not limited to: A. Install Temporary Protection for tree and landscape planting, as specified herein and as approved in the field by the City Representative and Landscape Architect. Install all other Temporary Protection in locations approved in the field by the City Representative and Landscape Architect. 1. Install posts at 10-foot intervals maximum, at corners, and at other changes in direction. Posts shall be set firmly in undisturbed soil, plumb and with a minimum of exposed height as specified. Securely attach fencing at a minimum of three points. 2. On pavement, provide self-supporting chain link fencing that does not require anchorage into the pavement. 3. Install hay bales or rolls of erosion control wattling, secured around trunk to a height of 6 feet.