Specifications include, but are not limited to: • Remove existing Walks, Curb and Gutter • Remove AC and concrete base layer and 2” AC grind as shown. 3. Work shall include cut/fill grading for subgrade with a tolerance +/- 0.10 Ft. 4. Work shall include Installing 8” Class II AB to 95% compaction for the vehicular asphalt pavement section and Installing 2” AC pavement section per the City of San Francisco Specifications. 5. Work shall include installing 8” Class II AB to 95% compaction in preparation of Precast Concrete Pavers by Others. 6. Include 9” Class II AB to 95% compaction under all site concrete. This work also includes removing the curb and gutter for the new curb and gutter realignment per the City of San Francisco Specifications. This Work Also includes permeant patching of the utility trenches on Mission Street per the City of San Francisco Specifications.