Specifications include, but are not limited to: upgrade and enhance three (3) wastewater pump stations, force mains and associated appurtenances. ; The consultant shall provide project administration including necessary project meetings, meeting notes, communication protocol, and separate cost accounting for the project, quality control and adherence to the project schedule. The consultant shall meet with the City to initiate the project and obtain a clearer understanding of the project elements. Other progress meetings will be scheduled upon mutual agreement with the City and may be conducted by conference call or in-person meetings. Deliverables include, but not limited to: • Meeting agendas, notes and minutes • Project schedule updates • Cost accounting summary ; Phase 1, Task 3 – Basis of Design Report Once all the existing data is captured and evaluated, the Consultant shall prepare a single Basis of Design Report (BODR) which evaluates cost-benefit alternatives for upgrade, rehabilitation and/or relocation, or elimination for each of the wastewater pump stations and associated appurtenances. Consultant shall perform detailed analysis for pertinent items including, but not limited to storage capacity, pump and motor operations and controls, ventilation/odor control and SCADA system monitoring and control. Each pump station shall be evaluated for the feasibility of an additional force main for redundancy