Specifications include, but are not limited to: • Review and evaluation for replacement of the existing automatic transfer switches at the Clarinda Correctional Facility. Existing switches are manufactured by ASCO. • Provide a complete report of the existing conditions of the transfer switches/system, recommendations for repair/replacement, and a cost opinion of the initial findings. • Collection of all required information to implement the construction of the new transfer switches. • Developing scope of work for the replacement of the existing switches. The design shall include development and completion of drawings and technical specification sections. Division 00 and 01 shall be provided by the State of Iowa. • Design of temporary bypass of the transfer switches and sequence of work to facilitate the construction period for minimal downtime of the operating system. • Developing scope of work to facilitate the use of the surrounding space throughout the construction phase. • Attending design kick-off meeting onsite to discuss desired outcome of the project with the Owner, Construction Manager, and Owner’s maintenance staff. • Collecting and providing meeting minutes from the design kick off and design review meetings. • Design for scope of work, development of bidding documents, development of construction budget, and construction administration with assigned construction manager (including responses to RFIs, review of submittals, approval of pay estimates, and regular onsite quality checks). • Quality control during Design, Preconstruction and Construction.