Specifications include, but are not limited to: The Project will consist of removing and disposing of the existing grease interceptors/holding tanks, sump pump and diverter valve located on the North Side of the Covel Commons. The exterior location of the tanks and pump is adjacent to a service driveway, loading dock, and Maintenance Yard. The existing vent pipes for the tanks and point of connection with the sewer lines located 5 feet from the building line shall be removed along with the ground cover and irrigation lines. The existing control panel and irrigation control valves shall be removed. A concrete walkway servicing the electrical room shall be demolished, allowing for removal and excavation of the existing tanks and pump. Contractor shall furnish and install the new sewer lines, sewer laterals, vents diverter valves, irrigation and irrigation controller, grease interceptors, pump and controller at the same location as the removed equipment. A new, poured in place concrete sidewalk and curbs removed or damaged during excavation shall be provided by contractor. The University will furnish and install all landscape once work is complete.