Specifications include, but are not limited to: The proposed Project involves upgrading an existing storm water pump station. Work shall include, but is not limited to, installing new pumps and motors to increase pumping capacity to 21,100 gpm; modifying the existing pump bays and wetwell; installing an onsite generator with diesel fuel pod and automatic transfer switch; installing a trash rack; installing a new motor control center; electric and structural upgrades; replacement of the existing programmable logic controller and Operator Interface Terminal; adding wetwell access hatches; providing redundant water level sensors and associated controls consisting of a primary electronic or pressure type sensor and a mechanical-type backup; installing protective fence around generator; replacement of existing 36” corrugated metal pipe (CMP) connected to the wetwell with 48” reinforced concrete pipe (RCP); replacement of existing 18” CMP connected to the wetwell with 18” RCP, installing new storm drain manholes, installing 15” RCP, installing a SCADA system and autodialer, providing temporary bypass pumping, demolition, and construction of a new wooden pump house.