Specifications include, but are not limited to: The RP-5 Expansion Project will upgrade and expand the Agency’s existing RP-5 plant from a conventional activated sludge wastewater treatment plant to a 22.5 MGD waterrecycling plant with the capacity of being expanded to 30 MGD in the future. The project duration is currently estimated for five years to completion. An 80-foot by 60-foot construction trailer (10, 12x40’) will be on site for the duration of the project to house critical IEUA staff and consultants; see Attachment G for trailer layout. The construction trailer will need to be equipped with access to utilities including fiber, potable water, and sewage. Additionally, grading and gravel will be required for a designated parking area.