Specifications include, but are not limited to: The SFIA Consolidated Administrative Campus Phase 1 Project (CAC) will consist of the design and construction of a multi-level, 140,000 sf Administrative Building, demolition of two (2) existing buildings, the construction of North Campus Road and East Campus Road to allow full vehicular and pedestrian access around the perimeter of the campus, and restoration of pavement and landscaping. The CAC project site is located on North McDonnell Road at West Field Road at the San Francisco International Airport. The project is to be designed and constructed with advanced sustainability features to meet LEED Gold certification. Construction will be phased in order to allow the occupants to move in to the new Administration Building prior to start of the demolition of the two existing building.