Specifications include, but are not limited to: (1). Scheduled Building East main sewer pipe work (annually) shall include a. Scheduled jetting only applies to the exterior main sewer lines of Building East along the perimeter adjacent to the building. Jetting shall include all equipment, tools, and labor, as needed, at the cost per service identified in Exhibit B. 1. Jetting equipment shall be capable of breaking through, grinding and cleaning out all tree roots and water blasting through grease, sludge, waste, debris in the interior of the main sewer lines. 2. The Contractor shall record video of the pipe interior and provide the DMV Project Manager with video imagery on a DVD or flash drive media, at no additional cost to the DMV. Recorded video media shall be the property of the DMV, media shall not be returned to the Contractor (2). Unscheduled Services and Emergency Unscheduled Services (on an as-needed basis) a. Unscheduled service and unscheduled emergency service work shall include but is not limited to: 1. Building East cafeteria waste line from the kitchen to the grease interceptor located directly east across the 25th Street driveway. 2. All DMV HQ Campus building interior and exterior waste, sewer, fresh water, condensate, floor drains, lines and or storm drain lines.