Specifications include, but are not limited to: The City of Moreno Valley (“City”) seeks Submittal Documents from qualified Design-Build Entities to design, fabricate, deliver, install, and commission an approximately 70 kilowatt (KWAC) solar photovoltaic parking canopy system, not net metered (“Solar Carport”) and electric vehicle charging stations (“EV Charging Stations”), consisting of one DC Fast Charger and two Level 2 Chargers, along with related appurtenances, including, but not limited to, inverters, conduit, cable, ceiling lights, City Hall lobby information kiosk integration, two revenue grade meters (one for the solar carport system and the other for the electric vehicle charging stations), American with Disabilities Act (ADA) parking lot upgrades, and related trenching, asphalt pavement, concrete, and landscape removal and restoration (“Project”) utilizing a design-build delivery method as authorized by California Government Code Section 4217.10 et seq. The project site is within the City of Moreno Valley City Hall Annex Building parking lot located at 14331 Frederick Street, Moreno Valley, California 92553.