Specifications include, but are not limited to: Construction of new storm water diversion structures, parshall flumes, and pipelines that allow diversion of primarily dry weather flow and first flush wet weather flows to the Salinas Pump Station for conveyance to the RTP for treatment, recycling, and reuse by the RTP facilities. The Phase 1B element includes the construction of a new pump station that will connect to the existing 36” Salinas Force Main Interceptor pipeline and a pump station adjacent to IWTF Pond 3 to convey industrial wastewater and storm water stored at the ponds to the RTP. Improvements to other existing storm water and wastewater infrastructure would be constructed to maximize the project benefits. This phase is vital to maximize the yield of storm water and other source waters that can be recycled.