Specifications include, but are not limited to: demolition of the existing 7.5 million gallon (MG) partially buried concrete reservoir and appurtenances; demolition of the exposed booster pump station and appurtenances, demolition of the existing electrical control building, demolition of existing above ground ancillary facilities; demolition of select buried pipelines and fittings; demolition of miscellaneous site work and any underground electrical work. Consultant shall note the most critical yard piping demolition involves the removal and replacement of the existing 16-inch MWD supply pipeline. The project includes asbestos abatement work for the removal of all asbestos containing mastic and window glazing in the existing building structure. Project site preparation work involves the installation of excavation shoring support systems to facilitate construction of the new facilities, site excavation, over-excavation and subgrade preparation.