Specifications include, but are not limited to: On-Call As Needed Services: 1) Contractor shall furnish potable Bulk Water Delivery service to the Department of Transportation. 2) The per gallon bid rate for the potable Bulk Water Delivery service is for all labor, tools, equipment, transportation, subsistence, and incidentals involved. No additional compensation will be paid. 3) Contractor shall respond by reporting to the designated site within the time period specified by the Caltrans Contract Manager or designee, Task Order or service call. 4) Contractor shall provide equipment and labor capable of delivering the required gallons of potable water in an eight (8) hour period as specified in each Task Order. Gallons needed at each location shall be specified in each Task Order.