Specifications include, but are not limited to: mobilization and demobilization; best management practices (BMP); traffic control plan and implementation; staking and survey monument restoration; utility company coordination and utility verification; clearing and grubbing, removal of existing roadway improvements, subgrade preparation, cold milling of existing asphalt pavement roadway; crack sealing, construction of asphalt concrete (AC) pavement, asphalt rubberized hot mix (ARHM) pavement, full depth pavement section repairs, PCC driveway approaches, PCC cross gutter; decorative PCC median pavement, PCC curb ramps, truncated domes, PCC curb and gutter, PCC median curb, minor landscaping and irrigation repairs, utility adjustments, monitoring well adjustments, traffic signage improvements, striping and painted curb improvements, and traffic signal improvements; as-built plan preparation, and all other work required by the contract documents.