SCOPE OF WORK: Work will involve furnishing all labor, materials, equipment, services, quality assurance and construction including but not limited to grinding, cold milling, hauling and disposal of the existing asphalt and concrete and installation of new pavement, excavation for pavement base repair, raising appurtenances and survey monuments to grade, night work, reconstructing survey monument boxes, sweeping, installation of curb ramps to meet ADA requirements, curb and gutter removal and replacement, sidewalk panel removal and placement, cross gutter and alley apron removal and replacement, residential and commercial driveway replacement, curb outlet – Type A replacement, relocation of pedestrian push buttons, installation of new pedestrian push buttons, installation of pedestrian barricades, tree trimming, root pruning, tree root relocation and pneumatic soil excavation, installation of root barriers, tree removal, weed abatement, weed spraying, replacing traffic striping/markings/markers/devices, replacing vehicle detector loops and stubs, traffic controldrawings and permits, storm drain inlet protection, and installation of inlet markers for various streets throughout the City.