Specifications include, but are not limited to: All materials, equipment, tools, labor and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be performed hereunder consist of traffic control; implementation and maintenance of Best Management Practices SWPPP; construction staking and monument perpetuation; removal and replacement of PCC curb ramps, curbs, gutters, cross-gutters, driveways, and sidewalks; cold milling; crack sealing; full depth AC reconstruction; asphalt concrete base course; asphalt rubber hot mix (ARHM) surface course; and adjustment of surface utilities to grade. The work also includes traffic striping and pavement markings, replacement of affected traffic signal detector loops, and all associated work as identified on the construction drawings.