Specifications include, but are not limited to: 1.Ensure safety is observed at all times. Use proper signs, cones and/or caution tape needed to ensure safety. Secure power source to unit and lock out. 2.Replace and install new (5) Ton Trane or an equal brand Evaporator coil, Condensing Unit (Provide rubber isolation pads for condenser to rest on) and Furnace (Provide and install furnace filter base) in the Gym building at Polinsky Children Center (Disconnect and remove condensing unit located on back side of building). 3.Disconnect and remove existing down flow furnace, cooling coil and related ducting in mechanical room and Replace it with an up flow ducting. 4.Provide and install all necessary gas piping and gas flex to include sediment trap to reconnect new furnace. 5.Use proper ways to recover the refrigerant from the old unit. 6.Provide and install sheet metal supply air ducting from new supply air plenum to duct connection at floor level.