Contractor shall provide all labor, materials, equipment, tools, transportation, insurance, and services to construct a tenant improvement on the UCSB main campus encompassing 2,775 square feet within the 3rd floor of the Student Resources Building 221 (“SRB”) and improvements to the accessible path of travel to the facility from the adjacent parking garage, as more fully described in the Construction Documents. The project will renovate approximately 1,275 square feet on the third floor of the SRB to improve staff and student circulation space and security with an additional 1,500 square feet of flooring will be replaced. The work will include the reconfiguration of three areas of open office to closed offices; new flooring and finishes as needed within the project area; four new storefronts with doors controlled by electronic an access control system, improved accessibility to facility from parking garage to entry with new detectable warning at bike lane, and reinstallation of bathroom accessories at accessible heights.