Specifications include, but are not limited to: 1. Tree removal: a. Remove 21 trees, in the Assessment. Plus 3 added, (total, 24 removals). b. Prune 11 multi stemmed trees in view corridor. Added-Prune 1 near residential property. c. All tree debris, logs, brush, chips etc. shall be removed from site. 2. Restoration of disturbed soils: a. All areas of the project site will be restored to pre-project conditions following completion of the work. This includes, but is not limited to, all areas disturbed by tree work, equipment access and staging. b. The Contractor shall repair at his sole expense all damage to existing park amenities and infrastructure (e.g. pathways and curbs) and vegetation that is cause by the work described in the scope of work.