Specifications include, but are not limited to: fabricate, provide and install shade a structure as indicated on the project specifications. This will include layout, saw cut and remove asphalt for footings, excavate and haul spoils for footings, set post and place concrete for structure post footings, erect steel members for shade structure install fabric shade at structure. Contractor must meet or exceed all city requirements, including license qualification and all certification to work and/or fabricate for the city. The contractor will provide labor, supervision, equipment, and all incidentals required to perform the work. Work shall meet or exceed all required federal, state and local codes and regulations.