Specifications include, but are not limited to: The work consists of resurfacing and reconstructing/rehabilitating the pavement within the existing right of way. The work includes cold planing and resurfacing the roadway with asphalt rubber hot mix concrete over pavement fabric, removal and re-construction of handicap access ramp (one), sidewalk, and curb & gutter, adjustments of utilities’ facilities, coordination of the adjustments of utilities’ facilities with the utility purveyor; adjustment of survey monuments to grade; replacement of traffic striping & markings, traffic loops , and all additional work necessary to properly construct the proposed improvements. This rehabilitation will re-establish the pavement structure, restore the surface integrity, improve driving conditions, and improve pedestrian safety on the sidewalks.