Specifications include, but are not limited to: The new RCC Dam will require full access control inside and out, downstream, upstream against watercraft, and on both abutments. Access Control shall include, but is not limited to, CCTV, detection systems, deterrents, signage, security fencing, and fiber network communication systems connected to the City's Security Operations Center. Facility Design shall include the design of a temporary bypass to be used during construction, for the protection and safety of the new RCC dam and site after rain/storm events. The primary tasks of Facility Design services include (1) Project Initiation and Scoping, (2) Design Development, (3) Agency Reviews and Permitting, (4) Construction Support, and (5) Commissioning and Record Documents.