Specifications include, but are not limited to: Provide all materials, labor and equipment to install temporary power distribution including, but not limited to temp breakers, transformers, wiring and poles per items B1-B5 on HMC 5/04/2020 DVC PEK – Temporary Building Phase 0 drawings Sheet E1.01 and associated work on Single Line sheet E5.01. Note alternate wiring and transformer options in Sheet Notes 1 & 2 on E5.01. Work includes one roof penetration each to Men’s and Women’s Locker electrical room and a wall penetration on the east and the west side of the Gym to feed existing electrical panels. See Supplementary General Conditions Section 00800 for required install dates and durations. Base bid price to include: 1. Installation, equipment cost for required durations (including total monthly leasing cost where applicable) and removal of temp wiring, poles and equipment.