Specifications include, but are not limited to: The work to be performed under this contract generally consists of furnishing equipment, materials, labor, and supervision required to construct five (5) groundwater pumping wells, twelve (12) piezometers, and up to eleven (11) groundwater monitoring wells within Chino Airport property (Airport) and the surrounding vicinity; destroy up to four (4) agricultural production wells on the Airport; and provide certain equipment, materials. The term “Site” is defined for use within this document as the physical Airport property owned by the County. “Onsite” will refer to areas within the Chino Airport property boundary and “offsite” will refer to areas outside the property boundary.