Specifications include, but are not limited to: 2.1 Remove and relocate existing site SDG&E electric meter 2.2 Demolition existing chain link fence and concrete slab 2.3 Provide a new 20x25 feet chain link enclosure with gate. 2.4 Prepare Construction Documents to bid MEB publicly 2.5 Metal Modular Enclosure Building (MEB) Specifications 2.5.1 Dimension: Prefabricated 10 ft x 20 ft 2.5.2 Location: new MEB will be sited at a new 20 feet by 25 feet chain link fenced area at the south west end of the 198 W San Ysidro Blvd, San Diego, CA 92173 San Ysidro Fire Station (SYFS) backyard 2.5.3 New 100A electrical service metal stairs to access upper deck HVAC. 2.5.4 MEB will be a temporary construction scheduled to remain in place approximately 10-15 years at the same site. A temporary foundation with seismically braced measures shall be provided.