Specifications include, but are not limited to: Provide and install:●Sewer, water, and gas lines per plan●Sewer to be sch 40 CI, ABS, or PVC●All dis-similar sewer connections to be made with Fernco couplings.●All gas to be threaded iron. Locate 1-½” mainline above tee-grid ceiling.●Gas drops at each heat closet to be ¾”.●Gas lines terminated with gas ball valve at each heater closet.●Water and gas lines to be pressure tested for 24 hours. District representative to witness.●All domestic hot and cold water to be type ‘K’ if under slab. Type ‘L’ above grade.●Copper joints to be soldered or Pro-press except unless noted on plan as ‘no Pro-press’.●Use dielectric unions where required●Kohler toilet with flushometer●Include toilet seat