Specifications include, but are not limited to: Access Control: Provide and install: (25) RP40 HID Multi-class Proximity readers, (25) GRI double pole/double throw ¾” or 1” door contacts, (25) Bosch DS 160i Request to exit motions, (25) Von Duprin door strikes, and all cabling for doors: 302,303,304,305,306,307,308,309,311,312,313,315,317,318,319,320,321,323,324,325,326,327,332,337 and 338. The equipment’s head end location is room 856. Provide and install: (2) iSTAR Ultra controllers configured in Altronix Trove 3 enclosures with (2) ACMs each, (4) total, (2) eFLOW 102NB 12V power supplies, (2) eFLOW 104NB 24V power supplies, (4) ACM8CB access control module, (4) PD8ULCB power distribution module. Provide and install: (2) Software House I/8 input boards to interface with the ELK relay output boards. Paging System: Provide and install: (1) Valcom 9972 controller, connect to existing system in RM 310. Provide and install (3) Valcom V-1020C Paging speakers and back box for locations: 1) TBD 2) TBD 3) TBD. Wireless Panic system: Provide and install: (2) ELK ELK-M1XRF319 wireless receivers in hallway locations: #1, on ceiling, outside of room 308 and #2, on ceiling, outside of room 321. Provide (16) ELK ELK-319PB1 Heavy duty panic buttons: Rooms 302-303-304-307--326- &327. Under desks 322,323 10 buttons will be designated as spares. Provide and install (2) ELK ELK-M1XOVR 16 output addressable relay boards to interface with the CCure input boards. Provide and install (1) ELK-C1M1LTEV Cellular radio and cabling needed to reach the nearest county switch,TBD. Provide and install (1) Bosch B-40-MB25 Antenna in a location that receives enough signal to hold a steady B4 signal or above. Equipment head end is room 310. Camera system: Provide, program and install: (2) AXIS P3807-PVE 180-degree cameras in opposite ends of the courtyard to cover entrances of the courtyard. (See map) Provide and install (4) Samsung QNF-9084-ProvQZ Cameras at each junction of the rear hallway. Provide and install: (1) ExacqVision recorder configured as follows in STE. 100 room 856 IT closet: EXQ IP08144TRZLE NVR 144T, W/8IP, LINUX,DUAL GB EXQ 500020070 26" RKMNT Sliding rail EXQ 500040159 Quad NIC Upgrade EXQ 500040395 CPU & 32GB Memory upgrade EXQ EVENIP01 QTY: 2 Provide and install (1) D-LINK DGS-1510-28P and (1) ALTRONIX NETWAY16G POE switch, and (6) Axis POE injector 02172-004. Provide and install B20-008-17 TripLite KVM Console Monitor Plus cabling for 3 NVR sytems. (2) currently at HE space. Provide and install AMER PWR SMX1500RM2UC UPS. Connect to designated port on County switch provided by ESS. Equipment head end is room 856 Provide all cabling, equipment, and wire management needed to complete the installation. A bill of materials has been supplied as a reference to specific equipment for compatibility. Alternatives and substitutes must be approved in writing prior to installation to ensure compatibility. All cables that are pulled by the installation company will be off the ceiling grid fastened to the building via J hooks or other appropriate wire management configuration. The Installation Company will properly caulk all holes created to pull wiring through fire rated walls and/or corridors. The Installation Company is solely responsible for all damaged or broken ceiling tiles. A pre-inspection is recommended before the start of work. An inspection will also be done upon completion of work to verify broken/damaged tiles have been replaced. Final system acceptance is dependent upon replacement of damaged/broken ceiling tiles. The Installation Company is solely responsible for all debris related to the installation of the above systems and will be responsible for removing all debris from the site. CCure equipment must be installed by a CCure certified Technician.