Specifications include, but are not limited to:. The project involves removing and replacing 10 damaged culverts, within the County ROW, located throughout the County. Existing pavement, striping and markings within pavement limits will be replaced per County Standards 219. Contractor shall provide traffic control compliant with MUTCD, as necessary. Contractor shall provide all materials and labor necessary to complete the work, including removal of damaged culvert trench spoils and debris, trucking of debris material to permanent disposal site(s), and construction of replacement culverts and other items including but not limited to ditch excavation, rip rap, minor re-grading RSP, and dewatering. In flowing conditions or where runoff is otherwise in potential contact with uncured trench backfill, the Contractor is to comply with the County standard dewatering/water bypass plan. Contractor to determine staging locations, unless otherwise noted in Plan sheets.