Loading...
Skip to main content
< Back to results

TUCKER LAKE LEVEE & DRAINAGE DISTRICT TWIN RIVERS PUMP STATION


Location
Arkansas
Publication Date
07/23/2020 09:09 AM EDT
Closing Date
08/04/2020 03:00 PM EDT
Issuing Organization
McClelland Consulting Engineers, Inc.
Solicitation Number
Description

Specifications include, but are not limited to: replacing the pumps, the existing 12” suction lines, all associated valves and fittings, and the existing 20” DIP pump discharge piping. Replace the existing 66” gravity effluent CMP with a 54” steel reinforced polyethylene pipe and excavate the existing soil and replace with new select fill for gravity pipe. Reconstruct and relocate the existing gravel entrance road, install a new 4’x6’ box culvert at the beginning of the entrance road, reconstruct the existing ditch slope, and install riprap at the slope. Replace two (2) existing flapper gates with canal gates and install stairs and working platforms at each canal gate and headwall. Bids shall be on a unit price basis.

Get instant access

Get instant access to solicitation details & future business opportunities.

to solicitation details & future business opportunities.

Get Access

Vendor packages with access to similar open solicitations

Matching bid notifications & access to all Statewide & Group bid details

Statewide

Matching bid notifications & access to all Statewide & Group bid details

Matching bid notifications from participating agencies

Group

Matching bid notifications from participating agencies

Access participating agency bids

Basic

Access participating agency bids