Specifications include, but are not limited to: A new 88,000 sqft High School, for the Berryville School District in Berryville AR. This is a project that includes demolition, earthwork, utilities, landscaping, asphalt paving, building and site concrete, polished concrete, masonry, structural steel, steel erection, millwork, waterproofing, insulation, EIFS, spray on fireproofing, shingles, TPO roof, gutters and downspouts, flashing and sheet metal, standing seam roofing, steel doors and frames, overhead doors, operable walls, hardware, aluminum storefront, glazing, drywall, metal studs, acoustical ceilings, rubber base, ceramic tile, carpet, epoxy flooring, acoustical panels, painting, markerboards, toilet partitions, flagpoles, signage, toilet accessories, knox box, projection screens, food service equipment, laboratory storage, stage curtain and track, manufactured casework, roller shades, fixed audience seating, telescoping seating, elevator, plumbing, HVAC, electrical, fire alarm, and communications.