Specifications include, but are not limited to: The scope of work consists of furnishing all labor, materials, equipment and incidentals required and constructing the improvements in their entirety as shown on the Drawings and as specified herein. The Work includes, but is not necessarily limited to, the following: 1. the installation of approximately 305 linear feet of 12” Class 350 ductile iron pipe, as shown on the drawings. 2. the installation of tapping sleeves, valves, and other appurtenances, as shown on the drawings and specified herein. 3. trench surface repair as applicable 4. clearing and grubbing 5. the construction and installation of a 300,000 gallon elevated pedestal water storage tank 6. the construction of a 20’ wide gravel access drive and parking lot 7. electrical service and associated work, as shown on the drawings