Specifications include, but are not limited to: The constructionof a permanent parking extension to the existing asphalt parking lot on the east side ofthe Lewis Science Center on the UCA campus in Conway, Arkansas. Work to include saw-cutting andremoving existing asphalt, removal of existing curb and gutter, removal and replacement of existingconcrete walks, the undercut excavation and backfill of poor soil subgrade, placement of additionalcompacted fill, placement of new curb and gutter, class 7 aggregate base course, and asphalt surfacecourse, parking stall striping, seeding, and mulching. Material specifications shall be in compliance withthe Arkansas Department of Transportation Standard Specifications, 2014 Edition, as amended on theconstruction drawings.