Specifications include, but are not limited to: This project encompasses work within two residential subdivisions: The first is Western Manor Pavement Reconstruction Project located within the Western Manor residential subdivision generally located at the northeast corner of North Burris Road and West Gila Bend Hwy (Hwy 84) within the City of Casa Grande. The second is Caspita Y Grande Pavement Reconstruction Project is located within the Caspita Y Grande residential subdivision at the northeast corner of Pinal Ave. (Hwy 387) and E Viola Street. The project generally consists of the full depth reconstruction of the existing asphalt pavements between the existing PCC curb and gutter sections as follows: Asphalt pavement reconstruction – 3” AC on 8” ABC 37,719 SY The Contractor shall mill the full thickness of the existing asphalt pavement surface course with an appropriate pavement milling machine. The work shall be completed for the full width and length of each designated street segment and in accordance with MAG Section 317 for asphalt milling. Placement and construction of asphalt concrete pavement shall generally consist of furnishing all materials, mixing the asphalt at an asphalt plant, hauling and placing a blended mixture of aggregate materials, mineral admixture, and asphalt binder to form an asphalt pavement course for placement upon a previously placed aggregate base course or asphalt pavement course.