Specifications include, but are not limited to: The West Anthem Lift Station No. 76 and Force Main and Water Main projects shall be constructed under one prime contract. The work includes, but is not limited to the following: • General site work, earthwork, and paving • Construction of wet well and manholes • General above ground and underground piping and valve improvements • Masonry wall and retaining wall structures • Submersible pump equipment • Electrical, Instrumentation, Control, and Security improvements • Approximately 4,554 linear feet of double barrel 18-inch and single barrel 8-inch sanitary sewer force main • Approximately 80 linear feet of double barrel 26-inch and single barrel 10-inch sanitary sewer force main • Approximately 3,427 linear feet of 4-inch potable water main including tapping sleeve and gate valve, and isolation valves with VB&C • Pavement removal and replacement along the force main and water main alignment. • Access road grading and reclaimed asphalt pavement surfacing • Connection to force main stub-outs at the force main discharge • Approximately 965 linear feet of APS utility 4-inch Ductbank / conduits