Specifications include, but are not limited to: •Build approximately 600’ linear feet of Sarival Road, including street lighting, utility adjustments from Waddell south, 20’ landscaping on both sides of the street, storm sewer/temporary scuppers•Build a temporary, but long term, transition from the proposed Sarival to existingSarival.•Build approximately 1500’ linear feet of Alexandria, including street lighting, utility adjustments, 20’ wide landscaping on the north side of the street, storm sewer/temporary scuppers from Sarival to Prasada Parkway•Build approximately 1,100’ linear feet of Prasada Parkway, including street lighting,utility adjustments, 20’ wide landscaping on both sides of the street, storm sewer/temporary scuppers from Alexandria to Waddell.