Specifications include, but are not limited to: Provide design assistance and services necessary to finalize the design to a point where the CMAR can provide a GMP for various project phases of the work. Identify any and all permits necessary to commence and finish the construction work and assign responsibility to the concerned parties for obtaining the respective permits, and document City and CMAR agreed assignment for obtaining; Review each design submittal by the design professional and provide comments regarding sustainability, required clarifications and measures to reduce costs; Provide alternate systems evaluation and constructability studies;Provide a comprehensive constructability and value engineering review with ranged construction cost estimate for each design submittal; Recommend construction phasing of the project for GMP purposes based on each design submittal.