Specifications include, but are not limited to: A. Preconstruction phase services by the CMAR may include the following: provide detailed cost estimating and knowledge of marketplace conditions provide project planning and scheduling provide for construction phasing and scheduling that will minimize interruption to City operations provide alternate systems evaluation and constructability studies advise City on ways to gain efficiencies in project delivery provide long-lead procurement studies and initiate procurement of long-lead items assist in the permitting processes participate with the City in a process to set a goal for local and SBE participation and implement the local and SBE process protect the owner’s sensitivity to quality, safety, and environmental factors B. Construction phase services by the CMAR may include: replace chilled water lines throughout the facility, primarily in the 6th floor mechanical penthouse, but also on levels 1 and 4, plus one vertical riser from level zero (below-grade); replace sewer, venting and domestic water piping in the main bathroom stacks.