Specifications include, but are not limited to: The work consists of (but is not limited to) applying a Stress Absorbing Membrane (SAM), fog seal, and furnishing a traffic control plan with devices in the following subdivisions: Desert Vista, Vista Del Oro Estates, Rancho Catalina, and in the following streets: Copper Spring Trail, El Conquistador Way (Valle del Oro to Oracle Road). Sunset Ridge II, Rancho Vistoso Neighborhood 10, consists of removing and replacing asphalt pavement in various locations throughout the subdivision, and furnishing traffic control plan with devices. All work is within the Town of Oro Valley. The contractor shall record all water valves and gas valves prior to the surface treatment or any construction.