Specifications include, but are not limited to: The Authority periodically requires Contractors to provide plumbing inspections, repair and/or installation work such as auger/clear toilets and waste lines, replace P-traps, wax rings, and angle stops; scope drain lines; locate, repair or replace leaking water and sewer pipes (PVC, galvanic, cast-iron, and copper tubing) in various Authority properties located throughout the City of Chandler. Services may be provided during normal business hours (8:00 AM – 5:00 PM) and occasionally after hours. The maintenance supervisor or their designee will call the Contractor to authorize work and the Contractor will call, email, or text when the job is completed. The Authority will inform Contractor of assignments that require Davis- Bacon or Arizona State prevailing wage rates apply to this contract. All work shall be inspected and signed off by the Authority Authorized Representative (such as Maintenance Supervisor or Designee) before the work is deemed complete. An Authority work order must be attached to each invoice. No payment will be made until all work is completed to the satisfaction of the Authority’s Authorized Representative and is deemed complete.