Specifications include, but are not limited to: LS 41 is a wet well/dry well facility with a firm pumping capacity of approximately 15.1 million gallons per day (mgd). Construction will be conducted under job order contract. Services will include pre-construction, construction and post construction associated CA&I services for the replacement of the electrical lineup, electrical utility service feed, dry well mechanical and safety improvements, and eliminating a confined space valve vault by raising the piping above ground. The refurbishment project will include the installation of new conduit for Pecos Park electrical service from new Salt River Project (SRP) switchgear to transformer; coordination with SRP; construction of concrete equipment pads and reinforced concrete slabs; replacement of the site service entrance section, manual transfer switch, automatic transfer switch and associated conduits, manholes and conductors; electrical shade canopy construction; pipe and valve coatings; special inspections as required by the annual facilities program; demolition of below grade valve vault and construction of above grade valve piping and valves; installation of new piping, valves; and replacement of three lift station pumps.