Prepare professionally sealed construction documents suitable to construct utility and roadway improvements on three (3) streets in the Coconino Estates Neighborhood within the City of Flagstaff, Arizona. These three (3) streets are anticipated to be bundled into one construction project known as the Coconino Estates Improvements Phase II Project (the Project) and delivered through the Design-Bid-Build Project delivery process. The Engineering Services will include, but are not limited to, the necessary surveying, traffic facilities inventory, geotechnical investigation and analysis, subsurface utility investigation and analysis, drainage analysis, asphalt pavement structural section recommendation, civil design, City utility design, Franchise Utility coordination, public participation, and coordination with other agencies and City departments as necessary to produce sufficient construction documents. The majority of this Project will be financed by the City of Flagstaff’s Road Repair and Street Safety Sales Tax.