Specifications include, but are not limited to: Phase 1: The installation of sewer, water, storm drain, concrete, paving, adjustments, signage, striping, street lights and landscape for Cadence Parkway and Toledo Road as outlined by the Improvement Plans for Cadence Parkway Phase 2 Infrastructure Plans. Excludes rough grading (by others) and dry utility mainline trench and conduit. Phase 2: The installation of sewer, water, storm drain, concrete, paving, adjustments, signage, striping, street lights and landscape for Cadence Parkway and Toledo Road as outlined by the Improvement Plans for Cadence Parkway Phase 2 Infrastructure Plans. Excludes rough grading (by others) and dry utility mainline trench and conduit.