Specifications include, but are not limited to: Contractor shall remove existing asphalt pavement to lines and depths per MAG Standard Specifications, Section 350; Asphalt shall be milled using a high flow milling drum; All milled materials shall be hauled off site and disposed at the Contractors expense; After milling, but prior to crack sealing, Contractor shall sweep entire street with a vacuum or regenerative air sweeper to remove loose material; Contract shall pre-lower all existing utilities, survey monuments, and brass caps prior to the milling operation; All pre-lowered utilities, survey monuments and brass caps shall have a temporary asphalt patch installed flush with existing pavement; Measurement for asphalt concrete milling shall be per square yard of milled asphalt complete in place in accordance with the project.