Specifications include, but are not limited to: 1 Mobilization LS 1 For $ _________________________ per Lump Sum $ ______________________________ 2 Traffic Control (includes temporary chip seal markers and door knocker notices to all residents on the streets in scope) LS 1 For $ _________________________ Lump Sum $ ______________________________ 3 Ashpalt Emulsion Binder TON 382 For $ _________________________ per Ton $ ______________________________ 4 Chip Seal Aggregate TON 2,745 For $ _________________________ per Ton $ ______________________________ 5 Fog Coat (CQS1H Diluted 50- 50 with Water) TON 190 For $ _________________________ per Ton $ ______________________________ 6 Obliteration of Stripe (12 to 18 inch) LF 1,650 For $ _________________________ per Lineal Foot $ ______________________________ 7 Obliteration of Stripe (8 inch) LF 200 For $ _________________________ per Lineal Foot $ ______________________________ 8 Obliteration of Stripe (4 inch) LF 20,700 For $ _________________________ per Lineal Foot $ ______________________________