Specifications include, but are not limited to: The Alma School Road Improvements, located on Alma School Road, from north of Pecos Road to south of Germann Road. This project will widen Alma School Road to three through lanes in each direction from Maplewood Street through the Germann Road intersection, with the road width tapering back to match the existing at Kingbird Drive. The project may also be extended to encompass the northeast corner of the intersection at Pecos and Alma School Road with northbound Alma School Road being widened to three lanes and tapered down to two lanes north of the intersection. Alma School Road from Pecos to Loop 202 will be improved by private developers. The improvements consist generally of the widening to the inside for additional lanes, raised landscaped median, curb, gutter, sidewalk, Americans with Disabilities Act upgrades, traffic signal upgrades, streetlights, traffic signal interconnect, storm drainage, irrigation, and wet/dry utility improvements. The improvements may require the purchase of utility easements and/or temporary construction easements. The Gilbert Road Improvements (Ocotillo Road to Chandler Heights Road) will add a third southbound lane on Gilbert Road between Ocotillo Road and Powell Place, and a new Traffic signal just south of Ocotillo Road to serve the Fry’s and Sprouts shopping centers. The project may also include road widening along the east side of Gilbert Road from Ocotillo Road to Chandler Heights Road for a third northbound through lane and associated improvements, including a new traffic signal at Brooks Farm Road, and also a new traffic signal north of Brooks Farm Road. The project may also include a fourth new traffic signal, stormwater retention basin, and associated improvements at the intersection on Chandler Heights Road at Mustang Drive/Desert Jewel Boulevard. The improvements consist generally of additional lanes, raised landscaped median, curb, gutter, sidewalk, Americans with Disabilities Act upgrades, traffic signal upgrades, streetlights, traffic signal interconnect, storm drainage, irrigation, traffic signals, and wet/dry utility improvements. The improvements may require the purchase of utility easements and/or temporary construction easements.