Specifications include, but are not limited to: The Engineer shall prepare a project specific scoping document that details the design tasks with input from the SRP-MIC and the City. The DCR and supporting reports(traffic, drainage, geotechnical, and concept) shall be evaluated and updated as necessary to ensure the improvements designated ; The engineer’s estimate shall be provided in a format that distinguishes the improvements between eligible local, regional and federally funded features. Reevaluate and update the existing NEPA documents. The DCR currently has an approved Categorical Exclusion which is nearing expiration. As part of the geotechnical update, the Engineer shall provide an analysis and recommendation for the backfill on the existing sewer in Pima Road. ; Review and evaluate existing data and previous reports, including but not limited to, drainage reports, utility maps, aerial photos, as-builts, MAG and City standards relevant to the project ; Design and as-built services for this project will be for Pima Road, GRW components, and for the intersection of Via Linda at 90th Street and shall include: a. surveying b. roadway including multimodal features c. drainage infrastructure d. earthwork e. traffic (ITS, signal design, pavement marking, striping, signing) f. landscape design: including the Pima Road section from Via De Ventura to the L101. g. construction traffic contro.