Specifications include, but are not limited to: The AZ ARNG TAG conference room project is to be upgraded for an overall modernized renovation. The project will consist of repairing and replacing building interior finishes and assets to ensure a fully functional and usable executive conference room. Construction services are required to add chair rails, wall paneling, drywall soffit with can directional and up lighting, custom ceiling tile replacement, and improve the overall air circulation for in/outflow of stall air out into the adjacent office area. The TAG conference room is located within the existing executive TAG office wing of the facility. A general contractor shall provide a package proposal. This includes all needed field verification, installation, materials, and construction infrastructure to support the installation and renovation to remodel the M5101 TAG executive conference room.