Specifications include, but are not limited to: Phase 1: Working with the architect on the design and pricing of Mount Elden Middle School. This will include the removal and redesign of the 300 wing and entry way. The entry way upgrade which includes drainage, building exterior continuity with the existing 300 wing and the proposed new wing, ADA compliance, stairs and ramp from the parking lot to the main entry. The main north south hall ADA compliance design. Phase 2: Tear down and construction of the 300 wing, drainage and ADA upgrades on the entry way, stairs, ramp and interior main north-south ramp. Phase 3: 100, 200 Wing Refresh retexture and paint each room, move the uninvents from the outside wall to the hall wall attic. The gym exits and stage will need to be made ADA compliant and a new floor installed. Change all lights from t-5 to LED. One bath on each level will be made ADA compliant.